Favorite this☆ bh018674 Construction site for 700 block, Brewster Housing Project during construction
Favorite this☆ bh017323 Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017213 Truck backfilling site, auxiliary low lift plant, Waterworks Park, Detroit water supply system
Favorite this☆ bh017172 Crane and truck excavating screen chamber, auxiliary low lift plant, Waterworks Park, Detroit water supply system
Favorite this☆ bh017166 Truck in pump pit during construction, auxiliary low lift plant, Waterworks Park, Detroit water supply system
Favorite this☆ bh016782 Office and service building during construction, Waterworks Park, Detroit water supply system
Favorite this☆ bh016773 Underground steam and condensate return lines for office and service building, Waterworks Park, Detroit water supply system
Favorite this☆ bh016683 Worker pulling cable between manholes, Waterworks Park, Detroit water supply system
Favorite this☆ bh016647 Worker moving transformer with Oliver crawler tractor, Waterworks Park, Detroit water supply system
Favorite this☆ bh016641 Metal clad switchgear being loaded onto truck, Waterworks Park, Detroit water supply system
Favorite this☆ bh016639 Workers unloading metal clad switchgear from truck at switch house, Waterworks Park, Detroit water supply system
Favorite this☆ bh016630 Worker in truck, disassembly of pump no. 13, Waterworks Park, Detroit water supply system