Favorite this☆ bh017419 Fourth floor and active chemical room, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017418 Dry alum storage tanks, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017417 Carbon slurry feeders, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017416 Excavation for carbon slurry line, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017415 Alum tanks and control panels, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017414 Control center for liquid and dry alum, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017413 Rotameters and dry alum feeders, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017412 Water meter and pressure reducing station, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017411 Sump pumps and control center, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017410 Rapid mix motors, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017409 Alum pumps and piping, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017408 Equipment for alum storage tank heating, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017407 Toilet room exhaust fans and incinerator, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017406 Liquid alum storage tank, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017405 Conduit to settling basin, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017404 Gates to basin no. 1 and no. 2, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017403 Paddle and shaft for rapid mix, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017402 Chemical feed hose, raw water conduit, Chemical Building during construction, Northeast Station, Detroit water supply system