Favorite this☆ bh016643 Workers moving metal clad switchgear with forklift, Waterworks Park, Detroit water supply system
Favorite this☆ bh016642 Worker setting metal clad switchgear in place, Waterworks Park, Detroit water supply system
Favorite this☆ bh016639 Workers unloading metal clad switchgear from truck at switch house, Waterworks Park, Detroit water supply system
Favorite this☆ bh016638 Worker rolling metal clad switchgear into switch house, Waterworks Park, Detroit water supply system
Favorite this☆ bh016636 Workers removing base plates and cylinder from pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016630 Worker in truck, disassembly of pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016629 Workers disassembling pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016625 Workers tightening flange bolts on header pipe, Waterworks Park, Detroit water supply system
Favorite this☆ bh016622 Workers setting tee in discharge header pipe, Waterworks Park, Detroit water supply system
Favorite this☆ bh016618 Workers placing butterfly valve in pump discharge line on base, Waterworks Park, Detroit water supply system
Favorite this☆ bh016610 Workers placing concrete for north transformers foundation enclosure walls, Waterworks Park, Detroit water supply system
Favorite this☆ bh016606 Worker laying tile for boiler room wall, Waterworks Park, Detroit water supply system
Favorite this☆ bh016604 Structural framework for boiler room and switch house, Waterworks Park, Detroit water supply system
Favorite this☆ bh016603 Workers constructing floor slab, Waterworks Park, Detroit water supply system
Favorite this☆ bh016602 Workers constructing floor slab, Waterworks Park, Detroit water supply system
Favorite this☆ bh016600 Workers constructing floor slab, Waterworks Park, Detroit water supply system
Favorite this☆ bh016599 Workers reinforcing slab before concrete pour, Waterworks Park, Detroit water supply system