Favorite this☆ bh017334 Crane lowering cylinder with steel cages, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017335 Venturi meter exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017336 Venturi meter exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017337 Worker hand stoning exit tube lining, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017338 Worker screeding Venturi tube lining, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017339 Concrete pipes and steel cages, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017340 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017341 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017342 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017343 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017344 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017345 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017346 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017347 Reinforcing steel and electrical conduits, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017348 Settling basin, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017349 Settling basin, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017350 Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017351 Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017352 Alum tank before lead lining, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017353 Installation of Venturi under exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017354 Raw water conduit Venturi exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017355 Installation of lead lining in alum tank, Chemical Building during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017356 Raw water conduit base slab and low lift plant connection during construction, Northeast Station, Detroit water supply system
Favorite this☆ bh017357 Chemical Building during construction, Northeast Station, Detroit water supply system