Image
Installation of Venturi under exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system
Description:
View of installation of steel plate Venturi under exit tube, Chemical Building during construction, Northeast Station, Detroit water supply system. Printed on front: "City of Detroit. Department of Water Supply. Contract no. NE-7. Northeast Station. Chemical Bldg. & misc. structures. Contractor Bryant & Detwiler Co. No. 49. Win Brunner photo. Date: 9-29-54." Typed on back: "No. 49. Installing steel plate Venturi under exit tube, raw water conduit."
Details
Resource ID:
bh017353
Creator:
Date Issued:
1954-09-29
Format:
1 photographic print mounted on fabric ; 7.5 x 9.5 in.
Filing Location:
MS/Detroit Archives. Water Board. Northeast Station. Contract NE-7. 2 of 7, 13:2
Rights:
Physical rights are retained by DPL. Copyright is retained in accordance with U.S. copyright laws.