Favorite this☆ bh016629 Workers disassembling pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016630 Worker in truck, disassembly of pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016641 Metal clad switchgear being loaded onto truck, Waterworks Park, Detroit water supply system
Favorite this☆ bh016642 Worker setting metal clad switchgear in place, Waterworks Park, Detroit water supply system
Favorite this☆ bh016643 Workers moving metal clad switchgear with forklift, Waterworks Park, Detroit water supply system
Favorite this☆ bh016644 Transformer being lifted with jacks, Waterworks Park, Detroit water supply system
Favorite this☆ bh016645 Workers setting transformer in place with crane, Waterworks Park, Detroit water supply system
Favorite this☆ bh016646 Workers lifting transformer into bay with crane, Waterworks Park, Detroit water supply system
Favorite this☆ bh016647 Worker moving transformer with Oliver crawler tractor, Waterworks Park, Detroit water supply system
Favorite this☆ bh016632 Removal of A-frame base from pump no. 11, Waterworks Park, Detroit water supply system
Favorite this☆ bh016633 Disassembly of pump no. 12 and no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016636 Workers removing base plates and cylinder from pump no. 13, Waterworks Park, Detroit water supply system
Favorite this☆ bh016638 Worker rolling metal clad switchgear into switch house, Waterworks Park, Detroit water supply system
Favorite this☆ bh016639 Workers unloading metal clad switchgear from truck at switch house, Waterworks Park, Detroit water supply system