Browse Collections

(649 - 672 of 798)

Pages

bh017159
Pump pit during construction, auxiliary low lift plant, Waterworks Park, Detroit water supply system
bh017160
Pump pit during construction, auxiliary low lift plant, Waterworks Park, Detroit water supply system
bh016334
Sewer pipe damage caused by earth slide, reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016333
Repair work caused by earth slide, reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016332
Earth slide near Field Engineers Office, reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016331
Caisson work along south wall, reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016329
Bank protection, reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016330
Reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
bh016592
Weir chamber during construction, Waterworks Park, Detroit water supply system
bh016383
Site of south stop log shaft, Waterworks Park, Detroit water supply system
bh016388
Assembled cutting edges for stop log shafts, Waterworks Park, Detroit water supply system
bh016384
Power line for tunnel on east side of coal canal, Waterworks Park, Detroit water supply system
bh016389
Excavation of river end of abandoned intake pipe, Waterworks Park, Detroit water supply system
bh016382
Exterior of fence at south stop log shaft, Waterworks Park, Detroit water supply system
bh016386
Excavation for screen chamber, Waterworks Park, Detroit water supply system
bh016381
Exterior of fence at north stop log shaft, Waterworks Park, Detroit water supply system
bh016385
Excavation and cofferdam for bulkheading intake conduit, Waterworks Park, Detroit water supply system
bh016486
University of Michigan civil engineering students in tunnel, Waterworks Park, Detroit water supply system
bh016487
Men accompanying mayor of Detroit on inspection trip of river and land tunnels, Waterworks Park, Detroit water supply system
bh016481
Screen chamber during construction, Waterworks Park, Detroit water supply system
bh016488
Workers posing in tunnel during construction, Waterworks Park, Detroit water supply system
bh016483
Tunnel during construction, Waterworks Park, Detroit water supply system
bh016489
Goldbeck cells taking pressure readings, Waterworks Park, Detroit water supply system
bh016484
Tunnel during construction, Waterworks Park, Detroit water supply system

Pages