Skip to main content
Browse Collections
Pages
-
-
EB02g506
-
Pile driver
-
-
bh023849
-
Foundation construction, David Stott Building during construction
-
-
bh023843
-
Pile driver, foundation construction, David Stott Building during construction
-
-
bh016312
-
Excavation site, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016276
-
Control chamber excavation, Waterworks Park, Detroit water supply system
-
-
bh016597
-
Workers bailing water from casings, pouring concrete and driving pile casings, Waterworks Park, Detroit water supply system
-
-
bh016596
-
Pile driver, Waterworks Park, Detroit water supply system
-
-
bh016963
-
Pile drivers and piling at dock, Waterworks Park, Detroit water supply system
-
-
bh016961
-
Pile drivers driving piles for dock wall, Waterworks Park, Detroit water supply system
-
-
bh016285
-
Control chamber during construction, Waterworks Park, Detroit water supply system
-
-
bh016962
-
Pile drivers and piling at dock, Waterworks Park, Detroit water supply system
-
-
bh016960
-
Pile drivers driving piles for dock wall, Waterworks Park, Detroit water supply system
-
-
bh016959
-
Workers pulling front row piles into line, Waterworks Park, Detroit water supply system
-
-
bh016309
-
Workers driving piles to support bank after earth slide, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016339
-
Reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
-
-
bh016340
-
Reservoir no. 2 during construction, Waterworks Park, Detroit water supply system
-
-
bh016310
-
Workers shoring bank after earth slide, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016306
-
Excavation site, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016308
-
Excavation site, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016307
-
Excavation site, reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh017179
-
Pile driver, connection to reservoir no. 1, auxiliary low lift plant, Waterworks Park, Detroit water supply system
-
-
bh016313
-
Pile driving operations during construction of reservoir no. 2, Waterworks Park, Detroit water supply system
-
-
bh016954
-
Pile driver at dock, Waterworks Park, Detroit water supply system
-
-
bh016955
-
Pile drivers and piling at dock, Waterworks Park, Detroit water supply system
Pages